PCBA Manufacture Printed Circuit Board Assembly SMT DIP COB BGA PCBA assembly
1. AIAQUA is an electronic contract manufacturing company
providing one-stop electronic assembly services.
Our services include: PCB manufacturing,
Electronic component sourcing, printed circuit board assembly,
chip programming, confirmal coating, cable assembly ,mold tooling, metal/plastic cases/enclosure assembly and final testing.
2. Supported Capabilities of our Circuit Board Assembly Services
3.Production process
4.Design care:
5.Welcome to AIAQUA Who WE ARE
6.Why choose AIAQUA
7. Our partners
8. Our Workshop gallery
9.Packing and shipping
Packing:
We pack the goods into plastic anti-static bag with stickers and in quality cartons with shipping mark.
Shipping:
International Express Shipping
DHL, UPS, FedEx and TNT are widely used in our shipping, it is door-to-door delivery service, transit time is 2~5 business days,
when arrivals you just feel at ease to sign the parcels. The shipping cost is competitive if shipped under our accounts.
Air Cargo
It will be cost-effective for you to ship your goods over at least 100kgs. The transit time is around 3~10 business days.
It depends, there may be unforeseen delays in customs. The shipping cost is lower than international express, but you
have to pick up the goods nearby your airport and manage the customs clearance all by yourself. Import duties and
taxes may be imposed, but unfortunately we have no idea how much they will cost.
1. AIAQUA is an electronic contract manufacturing company
providing one-stop electronic assembly services.
Our services include: PCB manufacturing,
Electronic component sourcing, printed circuit board assembly,
chip programming, confirmal coating, cable assembly ,mold tooling, metal/plastic cases/enclosure assembly and final testing.
2. Supported Capabilities of our Circuit Board Assembly Services
Types | THD (Thru-Hole Device) SMT (Surface-Mount Technology) SMT & THD mixed 2 sided SMT and THD assembly |
Quantities | 1 - 10,000 PCBs |
Parts/Components | Passives parts, smallest size 0201 Fine pitch to 8 Mils BGA, uBGA, QFN,POP and Leadless chips Connectors and terminals |
Component Package | Reels Cut tape Tube and tray Loose parts and bulk |
Dimensions | Smallest: 1.0 cm x 1.0 cm Largest: 120.0 cm x 45.0 cm |
Shape of PCBs | Rectangular Round Slots and Cut outs Complex and Irregular |
Type of PCBs | Rigid FR-4 Rigid-Flex boards |
Types of Assembly Process | Leaded process Lead-Free (RoHS) |
File Format of PCB Design | Gerber RS-274X Bill of Materials (.xls, .csv, . xlsx) Centroid data file (Pick-N-Place/XY file) |
Sales/Support | Emails Telephone |
Electrical testing | X-ray Inspection Automated Optical Inspection In-Circuit Testing / Functional testing |
Profile of Ovens | Standard Custom |
Time to Turn-around | 3 to 5 days for only PCB assembly 15 days to 20 days for turnkey PCB assembly |
3.Production process
4.Design care:
1 | If possible, use SMD component instead of DIP component. |
2 | Keep all DIP components on same side (Top/Bottom). |
3 | The distance between 2 solder pads of 0402 components should be 0.26-0.45mm. |
4 | No silkscreen on VIA holes. |
5 | Mark the pole for polarity components |
6 | Minimum trace/vias/pads spacing. |
7 | The distance between any two chip components should be at least 1mm; the distance between chip component and connector should be at least 5mm. |
8 | Keep clear around big IC (48pins or more) and BGA. 3.8mm is recommended. |
9 | The solder pad size (length/width) on PCB should be larger than pin size of component. |
10 | Temperature sensitive components (e.g. LED, battery) may be damaged in manual soldering process. |
11 | The distance between soldering points and neighbor SMD components should be at least 1mm. |
5.Welcome to AIAQUA Who WE ARE
Electronic contact manufacturer | How can we be faster and better than our competitors? | Quality |
We focus on: SMT, Though hole assembly, cases assembly, full components procurement, Projects management, engineering development ,software programming, testing fixture jig made, Etc. Contract electronics assembly OEM. | Software, hardware and mechanical design libraries cover the vast majority of our designs and ensure that engineering can focus their design and testing on the new aspects of the design. R&D provides the platforms of technology with implementation and integration support for the design engineers for newest sections of the circuit. Close integration between our teams in engineering, quality, testing, and new product introduction means that there are not after thoughts. We provide a vertically-integrated manufacturing service - equipped with state-of-the-art plastic mold fabrication, automation technology, computerized inspection, automatic in-circuit, and functional testing equipment. Located in Southern China, our manufacturing facilities are strategically positioned to support international distribution and sales. | Aiaqua International has integrated a structure of quality management procedures to ensure that a client's final product meets the design specifications. This is achieved by managing the quality of each step during the production process from supplier selection to work-in-progress inspections to final inspections and customer service.These quality management procedures include:• Supplier Evaluations and Audits • Preliminary Contract Review • Manufacturing Instruction Development • Quality Control of Materials • Manufacturing Process Controls • Final Testing and Inspections • Final Quality Audits • Implement Changes and Systems as per Customer Requirements • Customer Care Processes |
6.Why choose AIAQUA
7. Our partners
8. Our Workshop gallery
9.Packing and shipping
Packing:
We pack the goods into plastic anti-static bag with stickers and in quality cartons with shipping mark.
Shipping:
International Express Shipping
DHL, UPS, FedEx and TNT are widely used in our shipping, it is door-to-door delivery service, transit time is 2~5 business days,
when arrivals you just feel at ease to sign the parcels. The shipping cost is competitive if shipped under our accounts.
Air Cargo
It will be cost-effective for you to ship your goods over at least 100kgs. The transit time is around 3~10 business days.
It depends, there may be unforeseen delays in customs. The shipping cost is lower than international express, but you
have to pick up the goods nearby your airport and manage the customs clearance all by yourself. Import duties and
taxes may be imposed, but unfortunately we have no idea how much they will cost.